3/6/2014 7:03 AM
I was using the volume of fill material management tool on the GCSAA site and noticed it states a 44% shrinkage in material. I was wondering if anyone knew if this calculator added in the extra material to get the sand to the needed depth for us or if we need to calculate that ourself.
I was looking for between 4"-6" of new sand in a bunker and know it will compact. I just do not know if the shrinkage percentage is already added into the equation or if I needed to do it based on there 44%.