Morning Joe,
"2 wire or decoder systems"
here in the UK, we have been using two wire decoder systems since the mid seventies and have only got better and better. The key things to ensure are that the cable integrity is thoroughly for checked for low resistance and ensure all the wire connections are soldered (specify in the contract specification).
"Toro's new Infinity sprinkler head"
Just installed 10 of these and had them for just over a year. Same internals as the Toro 835's but the rest is new, great invention and keeps everything easily serviced from the top, no need to start digging unless you have a leak.
"HDPE pipe"
Been installed in the UK since the mid 90's, admittedly we are using MDPE (much cheaper) but using HDPE on fittings. it is without doubt a no brainer!!! After repairing PVC for years, this is the way forward. Smoother, more efficient and stronger, easier to repair, etc. Don't think anyone in the UK or Ireland even install PVC anymore?
"Loop vs. Herringbone fairway piping layout"
We have to main legs on the fairway, one for each side, so if one fails? it doesn't mean that the whole fairway is shut off.
If you want anymore information, just email me on
l.strutt@gwest.co.ukRegards
Lee
<br>